Pulp&Paper Innovation that
adds Values to our lives.
1974. 01
156 billion won
3-36, Ubonggangyang-ro, Onsan-eup, Ulju-gun, Ulsan, Korea
Around 700
KRW 683.1 billion (Approx. USD 480.5 million) (FY 2025)
Bleached Kraft Pulp
Square Tray, Square Bowl, Round Plate, Beverage Cup Lids, etc.
Neo Star Art, Neo Star Coat, Neo Star Ivory, Neo Star S-Plus
| 2024 Paper |
2024 Pulp |
2023 Paper |
2023 Pulp |
2022 Paper |
2022 Pulp |
||
| Production | 475,063 | 457,096 | 458,717 | 424,261 | 458,094 | 414,717 | |
|---|---|---|---|---|---|---|---|
| Sales | Domestic | 222,726 | 164,582 | 219,948 | 153,376 | 231,199 | 172,302 |
| Export | 245,541 | 76,570 | 238,809 | 44,975 | 219,155 | 30,570 | |
| Total | 709,419 | 657,108 | 653,226 | ||||
| 2021년 Paper |
2021년 Pulp |
2020년 Paper |
2020년 Pulp |
||
| Production | 467,221 | 423,749 | 440,257 | 392,572 | |
|---|---|---|---|---|---|
| Sales | Domestic | 234,411 | 173,095 | 2219,083 | 153,338 |
| Export | 232,212 | 45,659 | 220,820 | 57,107 | |
| Total | 685,377 | 650,348 | |||
| 2019년 Paper |
2019년 Pulp |
||
| Production | 494,872 | 453,797 | |
|---|---|---|---|
| Sales | Domestic | 223,105 | 164,391 |
| Export | 263,930 | 37,710 | |
| Total | 689,136 | ||
Paper Machine Equipment which makes base paper or uncoated paper
VOITH
Max 1,400m/min
9.3m(The largest in Korea)
8.7m(The largest in Korea)
49~148gsm
500,000mt/y
Coater Equipment which covers coating pigment on base
VOITH, IHI
1,250m/min
8.9m
8.63m
65~200g/㎡
Supercalendar Equipment that enhances glossiness and smoothness on coated paper surfaces
VOITH
900m/min
8.62m
65~200g/㎡
10 stacks(Per one machine)
2 Machines
Digest for cooking process Pulp goes into a blow tank, where a rapid change in pressure causes the wood particles to separate into individual fibers.
Mesto
1,400 ADT/D
Compact Cooking G2 (ImpBin)
White Liquor (NaOH, Na2S)
Bleaching facility Here it dissolves any remaining lignin and then brightens the brown pulp fibers, turning them white
| Classification | Design capacity | Brightness(%) | Bleaching chemicals |
| D Tower 1 | 542m3 X 1unit | 60.0~65.0% | C102 |
| D Tower 2 | 450m3 x 1unit | 89.8~90.0% | C102 |
| P/O Tower | 800m3 X 1unit | 89.8~90.0% | H2O2, NAOH, O2 |
Drying facility/Finishing process The dehydration and drying process of bleached kraft pulp transforming into a finished product/ Cutting and wrapping process into a specific size and weight
| Drying facility | Finishing process | ||
| Manufacturer | Andritz/Flakt | Manufacturer | Valmet |
| Design capacity | 730ADT/D | Bale Weight | 250Gross kg/Bale |
| Operation Speed | 40~125MPM | Bale Size(WxLxH) | 860 x 686 x 440(mm) |
| Paper Width | 4.8m | Wrapping material | Wire |
| Dryness(%) | 70~75% | ||
| Basis Weight | 950 ~ 1,050BDg/m2 | ||
Recovery Boiler Here a core process at the Kraft pulp mill with a combustion of concentrated black liquor (over 70%) for the production of electricity and the generation of steam and recovery of inorganic cooking chemicals.
| Classification | 1st Mill | 2nd Mill |
| Manufacturer | Ahlstrom | Tampella |
| Fuel | Black liquor (Solid 70% ↑) | Black liquor (Solid 80% ↑) |
| Capacity of combustion | 850TDS/D(Max.) | 1200TDS/D(Max.) |
| Amount of produced steam | 135Ton/H | 186Ton/H |
| Steam temperature | 450ºC | 450ºC |
| Steam pressure | 64kg/Cm3 | 64kg/Cm3 |
| Electrostatic precipitator | 4 EA | 2 EA |
Evaporation Preparing concentrated black liquor, which has a more than 70% of solid component concentration can be used for combustion in the recovery boiler, by evaporating the weak black liquor, which has a 15~20% of solid component concentration and has been obtained through the cooking and washing processes.
| Classification | 1st Mill | 2nd Mill |
| Manufacturer | Ahlstrom | Tampella |
| Evaporation capacity | 187Ton H20/H | 271Ton H20/H |
| Evaporator | LTV 6 layers(6 units), F.F 5 layers(7 units) |
F.F 6 layers(10 units) |
| Surface condenser | 4 EA | 2 EA |
| weak black liquor | 15% | 15% |
| concentrated black liquor | 72% | 82% |
Waste Water Treatment Waste water is optimally treated through a three stage disposal procedure at its own waste water treatment facilities
| Classification | Design Cap |
| 1st Chemical treatment | 53,000 |
| 2nd Chemical treatment | 78,000 |
| 3rd Chemical treatment | 78,000 |